1、 Equipment Introduction
This equipment mainly consists of a pressurized gas circuit, a corrosive environment container (test kettle), a preheating system, a heating system, a cooling system, an equipment rack, and other components.Boosting gas pathUsed to continuously pressurize the gas source and introduce the pressurized gas into a high-pressure container. Excess gas in the container is released through pressure regulating components such as unloading valves or back pressure valves on the gas path to maintain the gas pressure inside the container. By using this method to pressurize the gas medium, the flow rate or flow rate of the gas can be adjusted, and ventilation function can be achieved.Preheating systemUsed for preheating the gas output from the high-pressure pump.heating systemUsually, a split type heating furnace is used, which is wrapped around the metal kettle body to heat the medium inside the kettle.
2、 Technical parameters
Experimental kettle volume: approximately1.5L;
Inner diameter of experimental kettle: φ100mm(Adjustments may be made based on the design)
Inner cavity height of the kettle:200mm(The length of the temperature averaging zone shall not be less than100mm)
Maximum work pressure:20MPa;
Maximum operating temperature:650℃;
Temperature measurement point:3One, radial arrangement;
Temperature control method for experimental kettle: temperature measurement inside the kettle and temperature control of the heating furnace.
