Henan Sitong Boiler Co., Ltd
Home>Products>2000KG tubular steam boiler
2000KG tubular steam boiler
Product Introduction: This series of boilers only takes 3-5 minutes from ignition to steam generation, which is one tenth of the time required for ord
Product details

Product Introduction

This series of boilers only takes 3-5 minutes from ignition to steam generation, which is one tenth of the time required for ordinary gas-fired through flow steam boilers; Save at least 25% to 30% of fuel compared to ordinary gas-fired through flow steam boilers. Structurally, this model of boiler is a vertical structure with evenly distributed water pipes inside. The burner is placed on the top of the boiler and burns from top to bottom using a micro positive pressure combustion method

Performance advantages

1. Ignite for 2-4 minutes to generate steam
Ignite for 2-4 minutes to obtain sufficient pressure steam.
2. Safety devices and controls
Combustion, steam pressure, and water level are all fully automatically controlled, making operation both safe and economical.
3. Good heat transfer performance
High speed flow of combustion gas between water pipes. Good heat convection, fast heat attraction, and excellent heat transfer effect.
4. Quiet operation
The sound of the air supply fan and combustion is 5-6dB lower than that of old and similar products, even when working next to the boiler, it is not affected.
5. Efficiency 92%~96%
The furnace structure has excellent heat absorption effect, with a combustion heat efficiency of up to 92%~96%
6. High technology, high quality
Fully automatic CO2 welding, consistent production, uniform component specifications, and reliable quality.
7. Whole machine debugging factory, on-site installation free
The boiler is fully debugged before leaving the factory and requires no installation on site. Once the equipment arrives at the usage site and is powered on, it can be used immediately.
8. Water pipe temperature test
It can detect the temperature of the water pipe to check whether the boiler has produced scale. If the temperature rises to the set temperature, the boiler will automatically stop running.
9. Furnace temperature detector
It can detect the temperature of steam and automatically shut down when the temperature exceeds the set value, ensuring the safe operation of the boiler.
10. Automatic emission device
It can detect the conductivity of concentrated boiler water. When the conductivity reaches the emission standard, the boiler will automatically discharge the boiler water, which can stably control the quality of boiler water and improve the quality of steam, avoiding the occurrence of caustic embrittlement, scale formation, reducing boiler efficiency, and water pipe damage.

g7.jpg
[Performance Comparison]

Name Project

Through flow 1T steam boiler
Domestic conventional 1T steam boiler

10 ton steam boiler unit with continuous flow

(5 2T units combined)

Domestic conventional single 10T steam boiler
Evaporation rate T/H
1T/H
1T/H
10T/H
10T/H
Steam pressure Mpa
1.0Mpa
1.0Mpa
1.0Mpa
1.0Mpa
Thermal efficiency%
94%
90%
96%
89%
Natural gas consumption Nm ³/h
45.2 Nm ³/h (maximum operating condition)
71.6Nm ³/h (maximum operating condition)
580.5 (maximum operating condition)
1085Nm ³/h (maximum operating condition)

Gas production rate

(Target pressure)

3 points (on-site measurement)
25 minutes (on-site measurement)
4 minutes (on-site measurement)
45 minutes (on-site measurement)

Efficiency time difference

(Target pressure)

Save 22 minutes compared to regular boilers
Wasted 22 minutes compared to a through flow boiler
Save 40 minutes compared to regular boilers
Wasting 40 minutes compared to a through flow boiler

running cost

(Taking m ³/3 yuan as an example)

135.6 yuan/hour
214.8 yuan/hour
1741.5 yuan/hour
3255 yuan/hour
Operating cost per minute
2.26 yuan/minute
3.61 yuan/minute
29.025 yuan/minute
54.25 yuan/minute
Target pressure operating cost
6.78 yuan (pressure up to 1.0Mpa)
90.25 yuan (pressure up to 1.0Mpa)
116.1 yuan (pressure reaches 1.0Mpa)
2441 yuan (pressure up to 1.0Mpa)
Annual operating cost calculated for 365 days
395952.00 yuan/365 days * 8 hours
627216.00 yuan/365 days * 8 hours
5085180.00 yuan/365 days * 8 hours

9504600.00 yuan/365 days * 8 hours

Annual operating cost difference
Through flow boilers can save operating costs: 231264.00 per year
Through flow boilers can save operating costs: 4419420.00/year

External dimensions

(Length X Width X Height)

1750X1456X2222
5250×1700×2000
-
7400×2600×3200
Boiler type
Integrated vertical

Bulk horizontal

Integrated vertical boiler unit

Bulk horizontal

Factory condition
Complete machine trial operation and factory debugging
Boiler body accessories shipped in bulk
Complete machine trial operation and factory debugging
Boiler body accessories shipped in bulk
Installation method
Free installation on-site
Installation of on-site boilers and components
Use on-site boilers and assemble them for installation
Installation of on-site boilers and components
other expenses
-
Installation fee, material fee, and other expenses
-
Installation fee, material fee, and other expenses
control mode
fully automatic
fully automatic
fully automatic
fully automatic
Operation and maintenance
Unmanned operation
Dedicated person in charge
Unmanned operation
Dedicated person in charge
Automatic sewage discharge
have
-
have
-
Real time horsepower adjustment
have
-
Automatic scheduling capability
-

Note: If you need to learn more about the technical parameters and related quotation information of the through flow boiler, please contact our staff by phone.

technical parameter

type

ZT-2000

nature

can

Convert evaporation rate

Kg/h

2000

Generating heat

Kcal/h

1080000

Heat transfer area

9.9

Maximum pressure

Kgf/cm²

10

holding capacity

L

163

Boiler efficiency

%

92-96

Feedwater preheater

-

have

Combustion method

-

TWO-STAGE

Fuel consumption

natural gas

Nm³/h

116.1

LPG

PROPANE

Kg/h

100.3

BUTANE

105.4

Main equipment power

Kw

11.4

Transit power

Feed pump motor

Kw

3.7

Supply fan motor

7.5

Control panel

0.2

Product weight

Kg

1980

meet

Pipe

mouth

path

Gas inlet diameter

natural gas

mm

50

LPG

40

Inlet diameter of water supply

40

Steam outlet diameter

65

Boiler water discharge pipe diameter

25

Safety valve diameter

25&32

Automatic discharge pipe diameter

10

Outer diameter of chimney

ψmm

360

Introduce power cord diameter

mm²

14

ruler

inch

Boiler size

long

mm

1830

wide

1908

high

2307

[Whole machine accessories]

1.jpg
Item number
name

19

Boiler water discharge valve

18

Water pump

17

Control box

16

Pressure gauge

15

Pressure switch

14

Temperature switch

13

Y-shaped filter

12

Gas solenoid valve

11

Exhaust valve

10

Safety valve

9

Wind pressure switch

8

Water quality inspection valve

7

Chimney Head

6

Water level gauge

5

Liquid level electrode

4

Steam outlet

3

Gas pressure switch

2

Gas burner

1

Supply fan

Integrated accessories for the whole unit of the cross flow boiler

Serial number

name

Company

quantity

Brand

Factory condition

1

Boiler body

platform

1

Four-way boiler

Factory debugged

1

Boiler water discharge valve

only

1

Taiwanese heroes

Factory installed

2

Boiler feedwater pump

platform

1

Taiwanese heroes

Factory installed

3

Automatic control box

platform

1

Taiwanese heroes

Factory installed

4

System pressure gauge

only

1

Taiwanese heroes

Factory installed

5

Pressure controller

only

1

Taiwanese heroes

Factory installed

6

Temperature switch

only

1

Taiwanese heroes

Factory installed

7

steam trap

only

1

Taiwanese heroes

Factory installed

8

Gas solenoid valve

platform

1

East Germany

Factory installed

9

Gas burner

platform

1

Taiwanese heroes

Factory installed

10

Water quality inspection valve

only

1

Taiwanese heroes

Factory installed

11

Stainless steel chimney

individual

1

Taiwanese heroes

On site installation is required

12

Water level gauge

branch

1

Taiwanese heroes

Factory installed

13

Liquid level electrode

branch

3

Taiwanese heroes

Factory installed

14

Wind pressure switch

only

1

Taiwanese heroes

Factory installed

15

Exhaust valve

only

1

Taiwanese heroes

Factory installed

17

Safety valve

only

1

Taiwanese heroes

Factory installed

18

Gas pressure switch

only

1

Taiwanese heroes

Factory installed

19

Burner supply fan

platform

1

Taiwanese heroes

Factory installed

20

Boiler water softener

platform

1

Taiwanese heroes

On site installation is required

21

Liquid medicine tank

platform

1

Taiwanese heroes

On site installation is required

22

Boiler injection machine

platform

1

Taiwanese heroes

On site installation is required

23

Air preheating energy-saving device

platform

1

Taiwanese heroes

Factory installed

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!