Shandong Beide Machinery Co., Ltd
Home>Products>Pile driving mud sludge dewatering equipment
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    18660680543
  • Address
    Beide Machinery, Jiayue Town Industrial Park, Zhucheng City, Shandong Province
Contact Now
Pile driving mud sludge dewatering equipment
Tags:& Nbsp&nbspPile driving mud dewatering equipment&nbspPile driving mud sludge dewatering equipment
Product details
Equipment Overview
PRODUCT OVERVIEW
Mud is one of the important construction materials in pile driving construction, playing a role in balancing wellbore pressure, cooling drill bits, suspending drilling debris, and protecting hole walls. Circulating mud systems need to be installed in the construction of bridge bored piles, oil drilling, non excavation crossings, underground continuous walls, and other projects. The amount of mud used is related to the diameter, depth, and treatment method of the borehole. Generally, it is 3 to 5 times the pore volume. Some engineering mud usage can exceed 3000m3.

Building pile driving (pile foundation) technology is a cutting-edge technology in non excavation methods. As one of the main systems for mud and water pile driving (pile foundation), the mud treatment system directly affects the construction progress and quality. One of the prominent problems faced by the application of this technology is the treatment and rational use of mud.

The volume of pile driving mud is usually four times that of solid soil, with a ratio of 1:3 between the volume of solid soil and added water. The concentration of pile driving mud is usually between 150-220g/L. Mud usually contains about 5-10% sand and gravel. The moisture content of the separated sand and gravel is less than 20%. The moisture content of the cement cake is about 70%, and the moisture content varies greatly among different soil types. However, the cement cake can be directly loaded and transported without dripping water. Due to the good permeability of the cement cake after tempering, the internal moisture is easy to evaporate and is not prone to secondary mud formation. After 1-5 days of air drying, the moisture content can be reduced to below 30%. Concentrated water undergoes fine filtration to ensure compliance with the secondary discharge standards.

The service life of pile driving mud sludge dewatering equipment is not only related to the quality of the product itself, but the correct usage method can also increase the equipment's service life. Safety precautions:
1. Before starting the equipment, it is necessary to confirm that the startup of the equipment will not cause harm to the operators.
2. If the electric contact pressure gauge and overflow valve of the filter press are damaged, they should be replaced in a timely manner. Otherwise, it will cause the hydraulic station and oil cylinder to be in an ultra-high pressure state for a long time, shorten the service life of the hydraulic station and oil pipe, cause oil pipe rupture, and even cause oil cylinder rupture.
3. Please do not loosen the filter plate during the return process before the equipment feeding is completed, otherwise it may cause material leakage and even result in personal injury or death.
4. When pressing or pulling the filter press, please do not put your hands between the filter plates to tidy up the filter cloth, otherwise it may cause personal injury. If you want to organize the filter cloth, please stop pressing or pulling the plate.
5. Please do not open the touch terminals of the electrical control box or the junction box of the filter press motor when the equipment is powered on, otherwise it may cause electric shock and incorrect operation.
打桩泥浆污泥脱水设备

Tags:& Nbsp&nbspPile driving mud dewatering equipment&nbspPile driving mud sludge dewatering equipment
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!